MADRID-FIGUERES HIGH-SPEED RAIL LINE

- Client: ALSA RAIL AND ANSALDO
- Location: MADRID-BARCELONA-FIGUERES STRETCH
- Date: 2013-2016
Preventive and corrective maintenance of the fire protection systems of the service buildings of the high-speed Madrid – Figueras line.Hydrostatic pressure test in 250 HFC-23 gas cylinders with a gas load of over 10,000 kg.